Back

Design of the Spinto Manufacturing Hall

Client: Spinto Hungária Ltd.
Location: Miskolc
Year: 2016-18
6,000 m2


Subject:
Draft plans, authorisation plan, tender plan, detailed design.

Specialty: High-performance precision metal processing workstations with special, low-vibration machine bases.